SR37 and 186th Street Reduced Conflict Intersection
*For an enlarged image of the project, click here.
PROJECT: SR37 and 186th Street Reduced Conflict Intersection Road Trail
TIMELINE: Construction is expected to take place in 2023.
PROJECT GOALS: Increase safety and efficiency of the intersection.
OWNER: Indiana Department of Transportation
ENGINEER: SEH of Indiana
CONTRACTOR: Not awarded
SCOPE:
- Convert the existing two-way stop control intersection to a reduced conflict intersection.
- Redirect all through traffic and left turns from the eastbound and westbound lanes of 186th street to turn right onto SR 37.
- The intersection is planned as right in, right out, but will allow left turns from SR37 to Field Drive.
- Paved one-way median openings would be constructed between the northbound and southbound lanes.
- Median islands would also be constructed at the 186th Street approaches.
- All median islands would be mountable to allow for emergency vehicles to safely cross through the intersection.
MILEAGE: 0.3 miles
ESTIMATED COST: This is an INDOT project and not under the city's jurisdiction or financial control.
COUNCIL DISTRICT: 3 (Aaron Smith)
Stay Connected
- The main line of concern has yet to develop. We still expect a severe weather watch this evening. Treat all warning… https://t.co/VIWY80nHJ5Retweeted by City Of Noblesville
- The @NoblesvillePark Community Easter Egg Hunt has been postponed to a later date due to potentially dangerous weat… https://t.co/Al6b3p2tAM
- Enjoy your Spring Break, Friday Five will return next week! https://t.co/Xo07O8gidXRetweeted by City Of Noblesville
- Hamilton County is now in an enhanced risk for severe weather. The main threat is damaging winds, although short-li… https://t.co/AgIgLlV6kwRetweeted by City Of Noblesville