Contact Us
- Business: (317) 776-6330
- Staff Directory
- Hours: Monday - Friday
8:00 am - 4:30 pm
In this Department
Topics of Interest
State Road 32 Roundabouts (at SR38 and River Road)
*Conceptual rendering design, final design may be different*
PROJECT: Roundabouts at State Road 32/38 split and SR32/River Road
TIMELINE: Utility work in 2021, Road construction in 2022 and 2023. Anticipated roundabout construction at SR32/38 in 2022, and anticipated construction of SR32/River Road in 2023.
PROJECT GOALS: Increased safety and mobility of the corridor.
OWNER: This is a joint project between the Indiana Department of Transportation and the City of Noblesville.
ENGINEER: CMT
CONTRACTOR: Calumet Civil Contractors
SCOPE: Roundabouts at the intersections of State Road 32/State Road 38 split and SR32/River Road will replace traffic signals. A median will be placed between the two roundabouts, which will only allow for right in/right out movement at the entrances between the intersections.
MILEAGE: 0.2 miles
ESTIMATED COST: $6.5 million
- This is a matching partnership between INDOT and the City of Noblesville.
COUNCIL DISTRICT: 3 (Aaron Smith) and 4 (Dan Spartz)
Stay Connected
- The Mayor’s Office, @NoblesvillePD alongside @TMGCM built disaster relief sheds at International Disaster Emergency… https://t.co/FKDduJ7ROd
- This afternoon, we honored the longevity milestones for members of the @NoblesvilleFD & @NoblesvillePD. We thank th… https://t.co/E5Zll9sgpw
- Thanks to Teter Retreat Organic Farms for hosting our Directors Meeting today and sharing information on your nonpr… https://t.co/lc7GR5d0y9
- NFD is accepting applications for the 2022 hiring process. Follow the link to apply: https://t.co/JdvX2Dc1r7 https://t.co/9fOPiiszmwRetweeted by City Of Noblesville