Click Here to Print Page | Download Packet

Technical Advisory Committee
Thursday, November 15, 2018 at 09:00 AM
City Hall

AGENDA ITEMS

1.   (9:00-9:20)    Committee to consider Construction Plans and Secondary Plat for Flagstone Section 2 located
along the west side of Summer Road and south of 166th Street. Filed by Summerwood, LLC (John Maren – Owners Representative) and Stoeppelwerth & Associates, Inc. (Brian Robinson, Engineer) (PLAT 0199-2018, LOCP #1730-2018) and

1A.       Committee to consider Construction Plans for Flagstone Section 3 – GRADING ONLY located along the west side of Summer Road and south of 166th Street. Filed by Summerwood, LLC (John Maren – Owners Representative) and Stoeppelwerth & Associates, Inc. (Brian Robinson, Engineer) (LOCP #1731-2018)
                                                                  Planning Staff Reviewer – Justin Schuessler

2.   (9:20-9:30)    Committee to consider Construction drawings for a master drainage plan at Hood’s Gardens. Property located 11644 Greenfield Avenue in Noblesville Township. Filed by S & T Land Holding, LLC (Owners); Andy Wert of Church Church Hittle & Antrim (Applicant); and Civil Site Group (Eric Gleissner – Engineer)                      (LOCP 1675-2018)                                Planning Staff Reviewer – Joyceann Yelton

3.   (9:30-9:45)    Committee to consider Construction Plans (infrastructure), Secondary Plat for a 3- Lot and one parcel Non- Residential Subdivision known as “Union Chapel Crossing”. Property located in the 15000 block of Union Chapel Road, East Side. Filed by Jerel G. Reynolds (Owner), Revel and Underwood, Inc. (Rory Underwood – Applicants) HWC Engineering (Sean Downey, Engineer)       (LOCP 1698-2018, PLAT 0193-2018, LEGP 0192-2018)           Planning Staff Reviewer – Joyceann Yelton

4.    (9:45-10:00)    Committee to consider Construction Plans for “Lot 1 in Union Chapel Crossing” for the construction of an office building. Property located in the 15481 Union Chapel Road. Filed by Jerel G. Reynolds (Owner), Revel and Underwood, Inc. (Rory Underwood – Applicants) HWC Engineering (Sean Downey, Engineer)       (LOCP 1699-2018, LEGP 0194-2018)                     Planning Staff Reviewer – Joyceann Yelton

5.   (10:00-10:15)   Committee to consider Construction Plans for “Lot 3 in Union Chapel Crossing” for the construction of a Goddard School. Property located in the 15333 Union Chapel Road. Filed by Jerel G. Reynolds (Owner), Revel and Underwood, Inc. (Rory Underwood – Applicants) HWC Engineering (Sean Downey, Engineer)       (LOCP 1701-2018, LEGP 0195-2018)                      Planning Staff Reviewer – Joyceann Yelton


ADJOURNMENT