The 2009 Community Development Block Grant (CDBG) is a continuation of the 2008 project of replacement of sidewalk ramps within the City to meet ADA requirements. This project will continue in the northeast portion of Old Town Noblesville. In total, approximately 150 ramps are scheduled to be upgraded. As a part of the 2009 Street Rehabilitation program, these same streets will be resurfaced with asphalt. This project is scheduled to bid May 12, 2009 and begin construction in early June.
 
The Department of Engineering holds a Construction Update meeting on the second and fourth Tuesday of each month at 8:30 AM in City Hall Council Chambers. Further questions may be directed to Andrew Rodewald at (317) 776-6330.
 
Street Location General Scope Anticipated Begin Date
Harrison Street 10th St - 19th St Replace ADA Ramp
Morton Street 12th St - 16th St Replace ADA Ramp
12th Street Harrison- Monument Replace ADA Ramp
14th Street Harrison - North Replace ADA Ramp
15th Street Monument - Roosevelt Replace ADA Ramp
16th Street Conner - Field Replace ADA Ramp
18th Street Harrison - Monument Replace ADA Ramp
19th Street Harrison - Monument Replace ADA Ramp