The 2009 Community Development Block Grant (CDBG) is a continuation of the 2008 project of replacement of sidewalk ramps within the City to meet ADA requirements. This project will continue in the northeast portion of Old Town Noblesville. In total, approximately 150 ramps are scheduled to be upgraded. As a part of the 2009 Street Rehabilitation program, these same streets will be resurfaced with asphalt. This project is scheduled to bid May 12, 2009 and begin construction in early June.
The Department of Engineering holds a Construction Update meeting on the second and fourth Tuesday of each month at 8:30 AM in City Hall Council Chambers. Further questions may be directed to Andrew Rodewald at (317) 776-6330.
Street | Location | General Scope | Anticipated Begin Date |
Harrison Street | 10th St - 19th St | Replace ADA Ramp | |
Morton Street | 12th St - 16th St | Replace ADA Ramp | |
12th Street | Harrison- Monument | Replace ADA Ramp | |
14th Street | Harrison - North | Replace ADA Ramp | |
15th Street | Monument - Roosevelt | Replace ADA Ramp | |
16th Street | Conner - Field | Replace ADA Ramp | |
18th Street | Harrison - Monument | Replace ADA Ramp | |
19th Street | Harrison - Monument | Replace ADA Ramp |